12-Sep-2015, 10:54 AM
(This post was last modified: 12-Sep-2015, 10:55 AM by chipster1059.)
Quote:If I'm understanding you correctly, this is not a problem because horizontal and vertical wires crossing are not connected to each other. It impossible to have a "four-way" wire connection.This is the part of the level that was problematic:
I wanted the swich to work with the horizontal wire and not the vertical one, and to prevent the wires on the right from connecting with the vertical wire.
CC is awesome!
CC2 sets (still being updated): C1059-CC2 --- Walls of CC2
CC1 sets (all complete): C1059-2 --- C1059-1 --- 1059PG01 --- C1059-Christmas --- C1059-INSANITY --- C1059-CCLP4
My Youtube channel --- Fiver's Honeycomb --- Fanfiction.net
Good posts don't cost too much, yet many go unwritten.
CC2 sets (still being updated): C1059-CC2 --- Walls of CC2
CC1 sets (all complete): C1059-2 --- C1059-1 --- 1059PG01 --- C1059-Christmas --- C1059-INSANITY --- C1059-CCLP4
My Youtube channel --- Fiver's Honeycomb --- Fanfiction.net
Good posts don't cost too much, yet many go unwritten.